Showing posts with label ichat. Show all posts
Showing posts with label ichat. Show all posts

04 May 2007

Video Chat with ASU

Sometimes things just don’t go right.

Unfortunately settings issues with University computers, servers and firewalls prevented the video chats between language students at UC and ASU from going ahead last week, although some successful connections were made students were able to participate in the sessions as planned.

Central Queensland University is participating in the program this year, and we hope the technical issues can be resolved before the next planned session. Technical Staff at all three institutions are working on the problems.

20 April 2007

Video Chat with ASU

Probably the most significant project using IT resources in the Division.

Following last year’s very successful trial of video chat between Japanese language students at UC with English language students at Aichi Shukutoku University (ASU) in Japan, a permanent facility has been established in the CRC to continue the work started last year at UC and ASU.

Chats are expected to begin again this week.

Already other institutions are becoming involved in the interchanges, with Central Queensland University joining in when they can convince their IT people to make it work.

A special thanks to TSU staff for making it work here, and the Network Management Team in ICT Services for the work done and the positive support given the project.

30 January 2007

Projects for 2007

Looking ahead at the activities to occupy our time over the coming year.

With the demise of the IT Infrastructure Fund (the IT Loan), the move to leasing rather than purchasing of computers, and the general budget situation, the Technical Services Unit won’t be purchasing a lot of new equipment in 2007. This will give us the opportunity to commission or finalise a number of services and consolidate our role as a provider of specialised IT and Media services for the Division with the equipment and infrastructure we have available to us from the refresh of our services over the last few years.

Current projects of special note are:

iChatAV

After the success of the trial with Aichi Shukutoku University (ASU) in Nagoya, Japan last year, we will be putting in a permanent facility to support video chat between students here and elsewhere. The facility will be available through the Curriculum Resources Centre in Building 5.

BigVideo — Networked Video Editing Storage Solution

During Semester 1 2007 we expect to implement a networked storage solution for video editing in 9B23. Journalism students will be able to capture their original video material to the store where it can be accessed from any of the 8 workstations in the area. Students will be able to start their editing on one workstation, then return later to any of the workstations and continue their work. Once completed, their stories will be available from the store to the Television Control Room on the A floor in Building 9, where the stories can be played live into the news programs they produce as a part of their Unit.

Media Production Facilities refresh

The media production areas on the A Floor in Building 9 are being rebuilt in an effort to overcome a number of operational issues that have emerged with the facilities over the last few years. The facilities were looking a little tired, messy and outdated, so the refresh is smartening them up visually as well as technically to provide a better and more reliable experience for the users, and a more attractive facility to showcase the Division’s resources.

12 December 2006

2006 in review

The last twelve months have been a challenging time for the Technical Services Unit: after many years of relative stability in staffing, over the last eighteen months we have lost a number of staff with between them over 100 years of experience with the University.

The transition of common services like the network, web hosting, wireless networking, staff home directories and shared network drives, helpdesk software, and soon email to ICT Services has not been easy, with TSU staff having to deal with changing responsibilities while at the same time keeping the services going. It is still unclear how much responsibility members of the TSU will continue to have to look after common services even when the services are migrated to ICT Services: a year after IELTS and ASP moved out of the Division the TSU is still required to look after many of the IT services needed to support the ongoing operations of the units.

There have, however, been many successful activities and projects undertaken during the year that often go unnoticed in the day-to-day activities of the Division. Some major highlights this year include:

Printing and photocopying in the Division

In 2006 half of the Division’s photocopiers, and desktop and large-format printer were replaced. All of the desktop printers supported by the Division will have been replaced with new printers by Semester 1, 2007. All the Division-provided photocopiers have been replaced with multifunction devices that print, copy and sometimes fax and scan. By the start of Semester 1, 2007, all the remaining large-format printers will have been replaced with multifunction devices as well: providing double the number of stations for photocopying than before, and much more efficient printing (less that one-third the cost per impression for prints than the machines they replaced).

Media production areas refit

This year saw the start of the refit of the media production areas in Building 9. The refit is designed to overcome increasing maintenance and operational problems that have arisen after years of just keeping the studios and production areas going with short-term fixes and repairs, rather than taking a good hard look at facilities as a whole and eliminating the underlying causes of the ongoing problems. The project to refit the areas is well underway, and is expected to be completed in mid 2007, depending on the requirements to keep using the facilities for teaching during semester.

Wireless access

Over the last few months the Division’s pioneering wireless networking has been taken over by ICT Services. Staff and students can now access the University network through the UCWiFi network from an expanded number of areas around the Division, using the University’s standard UCanConnect service.

Wireless networking is now available in the CRC, CLRC, ILTC, Building 5 Seminar Room, COnference Room and PG Room in Building 9, the Microteaching Rooms, and the Art Room in Building 5.

Server refresh

Many of the servers used in the Division to provide network storage, backup, printer services, enterprise systems and so on came up for replacement in 2006. With the move to centralise common services, rather than replace the systems being retired the Division took the opportunity to focus on better providing for the Division’s specialist needs to support teaching, learning and research.

With the responsibility for staff network storage going to ICT Services, we have focused on developing specialised network storage for the large demands of audio and video editing with the BigVideo Networked Video Editing Storage Solution, initially servicing the Journalism workstations and the Television Control Room.

Large storage requires even larger backup, so a larger-capacity backup system has been installed to accommodate the new demands. Server rooms in Building 9 and Building 20 have been connected with high-speed network connections to allow large files to be moved quickly and efficiently from server to server depending on where the files need to be available. For example, video files edited on the B Floor of Building 9 are included in television programs produced on the A Floor, then served though the streaming server in Building 20, after being suitably prepared, for delivery through NowUC.

Network switches

It would be wonderful to report that network switches throughout the Division are up to the University’s standard, but not yet. The good news is that Building 5 and Building 1 are now upgraded, and there is a program in place to complete the replacement of the Division’s last remaining legacy switches in Building 9 and Building 20 with current technology in 2007. The plan at the moment is to have the replacement program completed by July, 2007.

ASU iChat

Probably the highlight of the year was the successful completion of four video chat sessions between Japanese language students studying at UC with English language students studying at the Aichi Shukutoku University (ASU) in Nagoya, Japan. Live video chats gave students the opportunity to converse with native speakers of the languages they were learning with an immediacy not usually available without international travel. Plans are underway to make the service a permanent feature in the Division from Semester 1, 2007.

UCTV

…and of course UCTV. In 2006, with the support of the University’s Network Management Team, AARNet and international supporters from research networks across Europe and North America, the satellite services being received through the dishes on the top of Building 20 now travel around the world (sometimes back to their country of origin!) in full digital quality via the next-generation research networks that connect Universities and research institutions. Hopefully in 2007 the services will get to Building 9!

30 May 2006

iChat with ASU

Sessions between Japanese language students at UC and English language students at ASU in Nagoya are completed for this Semester.

The four video chat sessions between Aichi Shukutoku University (ASU) and UC have now been completed, successfully.

UC Japanese lecturer Yuko Kinoshita has written a piece on the experience for the Divisional Newsletter that reflects all the Technical Services Unit needs to know about its reason for existing:

“At the beginning of the first session, none of us knew what to expect. All the technology appeared to be ready to go - thanks to George Bray, who looked after the technical side of this project. However, we were not sure how students would react to this new exercise, and still didn’t know how well the technology would work. We worried that the students might find it awkward to talk to strangers and the discussion would not happen. We also worried that the topics might be too difficult for them to handle.

“But the results were brilliant. The students on both sides just jumped into it as soon as we started the session, and they talked away for the whole two hours. Considering five minutes is quite a long time to talk to a stranger even in our own language, this was marvellous. They occasionally slipped away from the topic and started talking about the weather or their favourite music. However, they were still talking in the language that they struggle so much with in a normal classroom environment, and were also learning about a person who lives in a very different environment from theirs. This too was a precious cultural experience that they so rarely can taste.

“I have never seen students speaking so much Japanese, so spontaneously. They often struggled with words, but they kept going. Even the students who are normally unwilling to speak Japanese in class were talking with their Japanese partners for the whole session. Also it was notable that students did more thorough preparation for this project, compared to discussion classes in previous years, in which they discussed those issues in Japanese with their classmates. This probably means that the students were more motivated in these iChat classes, as it brought them a real experience of speaking with native speakers. I also observed the students’ level of confidence building up over four sessions. We are hoping that everyone can maintain the enthusiasm and the confidence they discovered through these classes, and stretch themselves even further. Although we cannot run the iChat program next semester due to conflicting schedules, Harry and I have more plans to make the technology work for us in the classroom - hopefully we can find more ways to enhance the classroom experience for our students.”

Thanks must go to the Technical Services Unit team, particularly George Bray, for making this work. Thanks also to UC Network Management Team, Geoff Rozenberg; UC Network Security Manager, Matthew Sullivan; the Deputy Head of the Division of Communication and Education, Leah Moore; and to the Communication Learning Resource Centre (for providing the venue and putting up with the intrusion!) and particularly Annabel Beckenham, Chair of the CLRC Committee, for her support. Harry Norris and Yusaku Oteki made it work at ASU.

A photo says it all:

Student from ASU, Nagoya (centre), video chatting with two UC Japanese Language students (inset)

See the UCTV website for a (silent) movie and some additional photos of one of the sessions. The movie is silent so that Journalism student could turn it into a story if they wanted to.

[See UC Monitor Online story]

02 May 2006

iChat sessions

Success with intercontinental communication and learning.

As this report is being completed, students from UC should be chatting with students from Japan’s Aichi Shukutoku University (ASU) via video chat links. The first of four planned video chat sessions between students from the two campuses, it has taken some effort to get the system in place to allow the connections to be made. Thanks are due particularly to the ICT Services Network Management team, the Deputy Head of the Division, the Communication Learning Resource Centre (for providing the venue), and particularly to our Service Delivery Manager for his perseverance.

[See UC Monitor Online article]

21 March 2006

ASU iChat links

Providing services in an environment full of malicious code becomes harder and harder.

Efforts continue on working around the University’s blocks on network ports that are preventing us from fulfilling our obligations with Aichi Shukutoku University (ASU) in Japan to collaborate using iChatAV. The proposed solution (establishing a server at UC mirroring the server at ASU, and connecting the two servers together through a proxy) has only about a 40% chance of working, so we are looking at other contingencies if as expected it doesn’t work.

Other solutions to be explored if necessary include:

  1. Booking space at the Australian National University to hold the classes there.
  2. Reconfigure the network segment used by the class to bypass ICT Services and connect to the Internet directly (this works off-campus, but it may be difficult or impossible to reconfigure the network to let it work here on campus).
  3. Isolate the part of the network used for the connections and reconfigure the Access Control List for that isolated area to allow the connections.

The classes requiring the facility are scheduled for Tuesdays from 1:30-3:30pm on 2, 9, 16, and 23 May, so we still have a few weeks to find a working solution.