Facilities and Services will go ahead with the proposed Minor Works in the media production space in Building 9.
Facilities and Services has contracted the work to be done to open up the space in the middle of the media production area in Building 9, beginning around 25 June 2007 and to be completed before classes resume in Semester 2.
There will be no access to this area from now to allow the TSU to prepare the space for the renovations: all the equipment will need to be either removed or sealed to prevent dust from the work getting into the gear.
As a part of the minor works the operation of the air conditioning in the television studio will be assessed to see what can be done to reduce the flow and noise while not compromising the air quality.